Completed Projects
KING SALMAN MOSQUE
-
Location: : Maldivs
-
Employer: : Alke - Turmaks
-
Closed Area: : 8000m2
-
Installed Power: : 800kvA
-
Starter: : 2018
-
Finish: : 2018
We are realizing all the electrical and mechanical works of the glass being done by the fund provided by Saudi Arabia in Maldives as AEC Engineering.
6 thousand people, 6-storey building; a library, multipurpose halls and a conference room.
Maldives of attaining independence by Saudi Arabia as a gift to commemorate the 50th anniversary, the majority of which is being built with materials exported from Turkey mosque was opened to worship in October 2018 plans to build.